- Dominion Energy, Application of Virginia Electric and Power Company, For approval or a certificate of public convenience and necessity to construct and operate the proposed Chesterfield Energy Reliability Center electric generation and related transmission facilities pursuant to § 56-580 D and 56- 46.1 of the Code of Virginia and for approval of a rate adjustment clause, designated Rider CERC, under § 56-585.1A 6 of the Code of Virginia, No. PUR-2025-00037, accessed May 12, 2025. ↩︎
- Dominion Energy, Virginia Electric and Power Company’s 2024 Integrated Resource Plan filing pursuant to Va. Code § 56-597 et seq., No. PUR-2024-00184, accessed May 12, 2025. ↩︎
- Chirag T. Lala et al., “Assessing Alternatives to the Proposed Chesterfield Energy Reliability Center (CERC)” (Applied Economics Clinic, July 2024), https://aeclinic.org/publicationpages/07/2024/assessing-alternatives-to-the-proposed-chesterfield-energy-reliability-center. ↩︎
- Virginia Electric and Power Company, “Air Permit Application for the Chesterfield Energy Reliability Center” (Chesterfield County, Virginia: Environmental Consulting & Technology, Inc, March 2025), https://www.deq.virginia.gov/home/showpublisheddocument/27961/638767579192800000. ↩︎
- U.S. EPA, “Basic Information about Lead Air Pollution,” Lead Air Pollution, June 13, 2024, https://www.epa.gov/lead-air-pollution/basic-information-about-lead-air-pollution., U.S. EPA, “Sulfur Dioxide Basics,” Sulfur Dioxide (SO2) Pollution, January 10, 2025, https://www.epa.gov/so2-pollution/sulfur-dioxide-basics., U.S. EPA, “Health and Environmental Effects of Particulate Matter (PM),” Particulate Matter (PM) Pollution, May 2, 2025, https://www.epa.gov/pm-pollution/health-and-environmental-effects-particulate-matter-pm., U.S. EPA, “Basic Information about NO2,” Nitrogen Dioxide (NO2) Pollution, July 16, 2024, https://www.epa.gov/no2-pollution/basic-information-about-no2., U.S. EPA, “Basic Information about Carbon Monoxide (CO) Outdoor Air Pollution,” Carbon Monoxide (CO) Pollution in Outdoor Air, June 21, 2024, https://www.epa.gov/co-pollution/basic-information-about-carbon-monoxide-co-outdoor-air-pollution. ↩︎
- Abt Associates Inc and University of North Carolina-Chapel Hill, Co-Benefits Risk Assessment Health Screening and Mapping Tool, version 5.2 (U.S. EPA, 2025)., Virginia Electric and Power Company, “Air Permit Application for the Chesterfield Energy Reliability Center” (Chesterfield County, Virginia: Environmental Consulting & Technology, Inc, March 2025), https://www.deq.virginia.gov/home
/showpublisheddocument/27961/638767579192800000. COBRA analysis prepared using 2028 Analysis Year Data and Table 3-6 from Dominion’s Air Permit Application. ↩︎ - U.S. EPA, Greenhouse Gas Equivalencies Calculator, version October 2024, 2024, https://www.epa.gov/energy/greenhouse-gas-equivalencies-calculator., Virginia Electric and Power Company, “Air Permit Application for the Chesterfield Energy Reliability Center” (Chesterfield County, Virginia: Environmental Consulting & Technology, Inc, March 2025), https://www.deq.virginia.gov/home/showpublisheddocument/27961/638767579192800000. ↩︎
- NASA, “How Far Away Is the Moon?,” SpacePlace, July 23, 2021, https://spaceplace.nasa.gov/moon-distance/en/. ↩︎
- Intergovernmental Panel on Climate Change (IPCC), ed., “The Earth’s Energy Budget, Climate Feedbacks and Climate Sensitivity,” in Climate Change 2021 – The Physical Science Basis: Working Group I Contribution to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change (Cambridge: Cambridge University Press, 2023), 923–1054, doi:10.1017/9781009157896.009. ↩︎